FAQs

  1. No need to approach City Survey office for getting Property Registration Card ( PRC)
  2. No need to apply separately to CFO, Traffic, SWD, HE, Sewage Remark.
  3. No need to communicate separately to Labour Department.
  4. No need to obtain Site inspection for NOC form Traffic, CFO, HE, Sewage, SWD, HE for their remarks.
  5. No need to approach to SWD, Traffic, Sewerage, HE, CFO for getting Remarks.
  6. No need to approach separately for apply, obtain site inspection and getting completion from CFO, Traffic, HE, SWD and sewerage department.
  7. No need to wait till OCC for getting HE department final completion as per section 270A of MMC Act 1888.
  8. No need to do separate application, persuasion, obtains approval from any of the department.
  1. Apply Online to all the departments such as CFO, Traffic, SWD, HE, sewerage etc. through Single Window Clearance System (SWCS).
  2. Wait for inspection date and time through console, SMS and e mail communication for site inspection.
  3. Down load digitally signed approvals from your console.
  4. Track regularly your proposal status and remarks through console, email, SMS communication.
  5. Do all the payments online through Net Banking, debit/ credit Card only.
  6. Apply jointly for getting completion remarks through your console for joint site inspection through Common Completion request form (CCRF).
  7. Insure final completion from HE department after getting water connection.
  8. Give your feedback after getting approvals to improve our service.
  1. All mandatory documents mentioned in common application form are not uploaded.
  2. The plans submitted are not in conformity with the provisions of DC regulations 1991 and not in consonance with SRDP-1991.
  3. The mandatory NOC such as MHADA NOC wherever applicable, Landowners NOC such as Estate NOC, Collector’s NOC etc are not uploaded along with online application.
  4. The access to the plot is not as per provision of DCR OR In case of a landlocked plot (i.e. not abutting to any access road)registered “right of way” agreement from the concerned owner is not uploaded with application.
  5. The valid ownership documents are not uploaded in order in favor of applicant.
  6. The drawing submitted shows deviation in Auto-Scrutiny report
  7. The document showing the authenticity of structure proposed to be retained/ where an extension to the structure either vertical without external column or horizontal is proposedare not uploaded etc.

No.
On receipt of online request for completion, common site visit of all concerned department will be arranged through system generated date and communication of the same will be made by email /SMS. The completion certificate is granted within 7 working days of application.

For obtaining Building permission Applicant needs to apply online along with all requisite Documents and PreDCR Drawings of proposed work through Empanelled professionals on BBMP portal i.e. http://bbmp.gov.in/.

The list of Registered Engineers, Architects, Structural Engineers and Supervisors registered with the BBMP is available BBMP website.

For submission of online Building Plan Application, a single Common Application Form (CAF) has been devised by BBMP. The Architect is required to fill-up the online CAF with all the information related to the plot viz. Name of the Owner, Size of Plot, Name & Category of colony, Name of the Zone, architect/structural engineer/supervisor details, etc. The information is automatically transferred to the concerned External A gencies (KSPCB, SEIAA, AAI, Fire etc.) for providing their NOCs as the case may require.

  • Plans and Drawings
  • Ownership Documents
  • Khata Extract / Khata Certificate / Up-to-date Tax Paid Receipt.
  • Declaration proforma comprising Certificate of appointment of professionals (Architects/Engineers/Supervisors), Certificate of Structural Safety, Certificate for supervision, No Nuisance and debris removal, Indemnity for Basement. This proforma needs to be digitally signed by the owner/architect/structural engineer and supervisor.

NOCs depend upon size of the plot, location, type of building, height of building, etc. You may check requirement of NOC as per the table below.

Sl No Building Parameter NoC Clearance Required from.
1.        Height of Building 15 m andabove 1.      Hindustan Aeronautical Limited (HAL)
2.      Jakkur Flying School
3.      Indian Air Force,Yelahanka
4.      Airport Authority of India
5.      Fire Force department
6.      BESCOM (Bangalore Electric Supply Company)
2.        Built up area greater than2000 sqmt and in case of residential building with 20 dwelling units and more 7.      Karnataka State Pollution Control Board (KSPCB)
8.      Bangalore Water Supply and SewerageBoard (BWSSB)
3.        Built up area more than 20000 sqmt 9.      State Environment Impact Assessment Authority (SEIAA)
4.        Cinema theaters, drive in theaters, Multiplexes, Fuel stations, Gas godowns 10.  District Magistrate
5.        Building abuttingrailway margin 11.  South Western Railways
6.        Site area greater than 20000 sqmt for non-residential building and residential building. 12.  Development plan approved by BDA
7.        Site abutting proposed metro lines 13.  Bengaluru Metro rail corporation ltd (BMRCL)

No. You don’t have to go to any office for obtaining NOC for building plan sanction. Your architect can find out the requirement of NOC by referring to the above NOC table. Your architect fills-up the CAF; the required information is transmitted online to the concerned NOC agency for issuance of NOC to BBMP.

Along with application, scrutiny fee is to be paid online in BBMP portal. All other fees shall be paid as per the demand note generated at various stages of construction (Plan Sanction, CC and OC). All fees can also be calculated through an online calculator reachable at the following link. (http://218.248.45.162:8090/BPAMSClient4/login.aspx)

In the spirit of Ease of Doing Business, the buildings have been classified on the basis of risk parameters to approve the building plans on fast track system. This classification also helps in fast tracking the issuance of completion certificate. The risk category categorized into 3 components as mentioned below:

  1. Residential Building
  2. Storage Buildings / Ware House / Godowns
  3. Non-ResidentialCommercial/ Industrial BuildingsOther than Storage Buildings / Ware House / Godowns
a) Risk Based Classification of Residential Building

Parameter Risk Category
Very Low Low Moderate High Very High
B1 B2 B3 B4 B5
Size of the Plot (Sq.m) Upto 150 Above 150 Upto 250 Above 250 Above 1000 8000 and above
upto 1000 Upto 8000
Height of the Building (m) Below 11.50 Below 15.00 Below 15.00 Below 15.00 Upto 15.00 & Above
No’s of Floors SF/GF+3UF BF+ SF/GF+ 3UF BF+ SF/GF+ 3UF BF+ SF/GF+ 3UF > 1BF+ SF / GF +4 UF and above

b) Risk Based Classification of Storage Buildings / Warehouse / Godowns

Parameter Risk Category
Very Low Low Moderate High Very High
B1 B2 B3 B4 B5
Covered Area on all floors/ Built-up area (Sq.m) Upto 250 Above 250 Above 2000 Above 4000 12000 and above
Upto 2000 upto 4000 Upto 12000
Height of the Building (m) Below 15 Below 15 Below 15 Below 15 Upto 15 & Above

c) Risk Based Classification of Non – Residential/ Industrial Buildings

Parameter Risk Category
Very Low Low Moderate High Very High
B1 B2 B3 B4 B5
Size of the Plot (Sq.m) Upto 150 Above 150 Upto 250 Above 250 Above 1000 8000 and above
upto 1000 Upto 8000
Height of the Building (m) Below 11.50 Below 15.00 Below 15.00 Below 15.00 Upto 15.00 & Above
No’s of Floors SF/GF+3UF BF+ SF/GF+ 3UF BF+ SF/GF+ 3UF BF+ SF/GF+ 3UF > 1BF+ SF / GF +4 UF and above

There are total 8 no. of steps involved in obtaining construction permit.

  1. Submit online Common Application Form(CAF)
  2. Grant of online sanction including NOC from external agencies (if required)
  3. Payment of requisite charges and release of sanctioned building plan
  4. Online Application for Commencement Certificate upto plinth level
  5. Issue of Commencement Certificate after duly paying the requisite charges
  6. Submission of application in Occupancy Certificate Common Application Form (OCCAF) for issue of Occupancy Certificate
  7. Inspection by BBMP& NOC agencies
  8. Intimation of compounding fee & charges if applicable & release of Occupancy Certificate

The sanctioning authority may grant or refuse the sanction and shall communicate its decision to the owner / applicant within the time limit as specified in “Risk Based Matrix”

Timeline for Approval of Building Permits

Head office Zonal Offices
Designation Stipulated time limit Designation Stipulated time limit
(No. of working days) (No. of working days)
B5 B1, B2, B3 & B4
Plan Sanction Commencement Certificate Occupancy Certificate Plan Sanction Commencement Certificate Occupancy Certificate
Very Low & Low Risk Moderate and High Risk Very Low & Low Risk Moderate and High Risk Very Low & Low Risk Moderate and High Risk
B1 & B2 B3 & B4 B1 & B2 B3 & B4 B1 & B2 B3 & B4
Assistant Town Planner / Town Planner / AE / JE Building license cell 7 3 7 Assistant Town Planner / Town Planner / AE / JE Building license cell 6 7 4 5 6 7
ADTP/ AEE - Building licence cell 3 2 3 ADTP/ AEE - Building licence cell 4 5 3 3 4 5
Deputy Director/ EE - Building licence cell 2 2 2 Chief Engineer - 3 - 2 - 3
Joint Director/ SE -Building licence cell 2 1 2 Joint Commissioner - 2 - - - 2
Additional Director/ CE -Building licence cell 2 1 2 - - - - - - -
Commissioner 2 - 2 - - - - - - -
Total 18 9 18 - 10 17 7 10 10 17

The applicable charges are required to be deposited through online mode only such as RTGS / NEFT/Net Banking etc. No cash/cheque or Demand Draft is accepted.

Transfer of Development Rights (TDR) means making available certain amount of additional built up area in lieu of the area relinquished or surrendered by the owner of the land, so that he can use extra built up area either himself or transfer it to another in need of the extra built up area. Karnataka Town and Country Planning (Benefit of Development. Rights) Rules, 2016 may be referred to in this link.

To utiliseTDR , the site /building

  • shall not have abutting road less than 9 m wide [sub rule (5) of rule (4)]
  • Additional FAR using TDR shall not exceed 0.6 times of the originally permissible FAR [sub rule (6) of rule (4)]
  • Parking provisions shall comply with ZR requirements for the additional floor area achieved using TDR [sub rule (7) of rule (4)]

  • TDR shall be registered in the name of plot owner or developer who is having GPA for the development of the building
  • Person/ Firm having TDR in their name can use TDR
  • Sub- Sect (13) of sect 14 (B) of KTCP act says; ‘’ The development rights may be utilised within the same plot or in any other area in the same LPA by the owner or owners of the such Development Rights may transfer the Development Rights to somebody else who can use that Development Rights on any other area within the Local Planning Area, asTransferable Development Rights
  • No transfer or utilization of the DR shall be valid unless it is registered by the planning authority sub- Sect (16) of sect 14 (B) of KTCP act 1961

The Land Uses maps as per Revised Master Plan – 2015 can be referred in this link. http://bbmp.gov.in/en/web/guest/landusemaps

The Architect/Structural Engineer/Site Supervisor/Site Engineer /Construction Company including contractor/Sub-Contractor shall be held liable for any structural flaws or defects in all risk categories of buildings having plot area 750.0 sqm / above and the construction company including contractor / sub-contractor shall take decennial professional liability insurance to cover for such liability.

The service of the Architect can be dispensed with any time, if not satisfied with his/her performance and information through e-mail in this regard be sent to the concerned Building License Department / IT helpdesk for necessary action.

The status of file will automatically gets updated in the online portal and the architect can check the status of file at any given point of time from his console.

After approval of various concessions involved in the proposal online from competent authority, IOD is issued as per the EODB. After online submission of compliance of the conditions of IOD at the stage of plinth CC, Commencement Certificate will be issued online to start the work upto plinth. After completion of plinth the joint site inspection of plinth shall be submitted online. Thereafter the further Commencement Certificate will be granted on submission of compliance of Further CC conditions and payment as per Demand note for further CC Stage. After completion of building the applicant shall submit the Building completion certificate (BCC) and request for joint site inspection along with compliance of OCC/BCC conditions as per SOP. Thereafter the Occupancy Certificate/ BCC is granted.

  1. As far as various department of BBMP are concerned there is no need to apply separately to individual department to obtain inter departmental NOCs as same can be obtained through single window system.
  2. Apart from BBMP departments, some external government bodies are also linked to get online remarks/NOCs through online Building Permission request application viz. Civil Aviation NOC, National Monument NOC etc.
  3. Mandatory NOCs required such MHADA NOC for proposal under DCR 33(6) in case of Cessed building , 33(5) / 33(7) and 33(9) or for repairs of Cessed Building or NOC from Collector if land belongs to State Govt. same are need to be uploaded before submission of single window application.
    Please refer EODB (Ease Of Doing Business) manual issued dated 29/12/2015 available on BBMP website.

The DP remarks can be obtained online by payment of stipulated charges on BBMP website

Tenantable repair refers to a repair which will render a premise fit for habitation. There is NO necessity to apply for enlisted tentable repairs mentioned in the clause 342 B of MMC act-1888.
Tenantable repairs in the said section shall mean only,-

  1. plastering, painting, pointing.
  2. changing floor tiles.
  3. repairing W.C. bath or washing places;
  4. repairing or replacing drainage pipes, taps, manholes and other fittings.
  5. repairing or replacing sanitary water plumbing, or electrical fitting and
  6. repairing or replacing sanitary water plumbing, or electrical fitting; and
    1. change in horizontal and vertical existing dimensions of the structure,
    2. replacement or removal of any structural members of load bearing walls,
    3. lowering of plinth, foundations or floors,
    4. addition or extension of mezzanine floor or loft, and
    5. flattening of roof or repairing roof with different material.
    However for guniting/ structural repairs the regular proposal shall be submitted.

As per qualification criteria mentioned in the circular (attached herewith) applicant needs to apply to the Dy.Ch.E.(BP)City’s office. The same are scrutinized and eligible candidate are invited for interviews. Depending upon the result of the interview and payment of prescribed license fees , license is issued to the qualified and eligible candidate.
The online process will be very soon available on the BBMP.gov.in

The building constructed shall be approvable in nature. On receipt of the application in the prescribed format along with requisite documents viz. notice under section 44/69 of MR&TP act and 337/342 of MMC Act request for regularization with valid reasons for executing the work without approval / beyond approval / CC , the regularization proposal will be processed and penalty as prescribed in the circular issued under number CHE/2052/DP/Gen dated 04/02/2011 or prevailing circular at the time of regularization will be imposed depending upon the category & type of the regularization.

Under EODB, SWCS (Single Window Clearance System) there is no need to apply separately to get these NOCs. These NOCs are now self/automatic generated by the system as per the input data filled in common application form by LS/Architect

On Submission of online proposal by LS/Architect & the IOD is issued in 30 working days.
On Submission of compliance of Plinth CC Conditions online by LS/Architect, the Plinth CC is issued in 3 working days.
On submission of OC/BCC application by LS/Architect, Part/Full- OCC/BCC is granted within7working days.If all the required documents are submitted and if the work is executed as per approval

Yes, in order to ease out the processes, BBMP has already started issuance of OCC/BCC simultaneously.

As per policy Circular issued vide No.CHE/DP/19248/GEN dated 11.10.2017 such facility of installment payments allowed for various premiums stipulated in the said circular.

The common reasons observed for rejection of applications are as follows:-

  1. All mandatory documents mentioned in common application form are not uploaded.
  2. The plans submitted are not in conformity with the provisions of DC regulations 1991 and not in consonance with SRDP-1991.
  3. The mandatory NOC such as MHADA NOC wherever applicable, Landowners NOC such as Estate NOC, Collector’s NOC etc are not uploaded along with online application
  4. The access to the plot is not as per provision of DCR OR In case of a landlocked plot (i.e. not abutting to any access road)registered “right of way” agreement from the concerned owner is not uploaded with application
  5. The valid ownership documents are not uploaded in order in favor of applicant.
  6. The drawing submitted shows deviation in Auto-Scrutiny report
  7. The document showing the authenticity of structure proposed to be retained/ where an extension to the structure either vertical without external column or horizontal is proposedare not uploaded etc.

The site inspection by the Building Proposal Staff is not required for issue of IOD.The same is carried out only at the time of plinth checking and while issuing OC/BCC

The LS/Architect can contact through email / telephone / SMS / EODB Whatsapp group in helpdesk though his autodcr console. The helpdesk email id is BBMPhelpdesk@gmail.com .

As per EODB circular, the applicant may request for Zero FSI IOD/CC and can start the work of plinth without waiting for concession approval from competent authority subject to submission of Comprehensive Undertaking and Indemnity as prescribed in EODB Manual.

No.
On receipt of online request for completion, common site visit of all concerned department will be arranged through system generated date and communication of the same will be made by email /SMS. The completion certificate is granted within 7 working days of application.

  1. For accessing online system first you need to register yourself with required detail like your education, license no and other general information to BBMP.
  2. After registration architect will get login credential from BBMP.
  3. After successful registration with BBMP you will able to create proposal & submit along with requisite document & proposed Drawings.
  1. Go to ‘Apply NOC’ tab in proposal details listed in draft proposal on dashboard.
  2. Check NOCs for you want to apply.
  3. If you already have NOC simply attach by clicking attach button.

You may track the status of NOC .

  1. Go to ‘View NOC’ tab in proposal details view in dashboard.
  2. Here you can trace your proposal, status of proposal if approved you can view Certificate also
  1. Go to ‘Annexure Details’, In ‘Common Application Form’ fill up the details.

The system is automatically assigning the proposal to Sub Engineer of respective zone under randomization.

  1. Open Document Checklist, select the concern head and click on attach symbol as shown in front of concern head.
  2. Attachment window appear.
  3. Select files for attachment
  4. Click on ‘Select’ to browse file.
  5. Attach file & freeze the document.
  6. Submit file.
  1. Click on ‘Approved’ link from IOD proposals and select the file to view the certificate.
  2. Go to ‘Application Summary’, click on Proposal Stages.
  3. Here you can able to view certificate in against IOD proposal in certificate column.
  1. Go to First CC, click on ‘Approved’ and select the file to view the certificate.
  2. Go to ‘Application Summary’ click on Proposal Stages.
  3. Here you can able to view certificate against first CC proposal in certificate column.
  1. Go to FCC, click on ‘Approved’ and select the file to view the certificate.
  2. Go to ‘Application Summary’ click on Proposal Stages.
  3. Here you can able to view certificate against FCC proposal in certificate column.
  1. Go to OCC/BCC, click on ‘Approved’ and select the file to view the certificate.
  2. Go to ‘Application Summary’ click on Proposal Stages.
  3. Here you can able to view certificate against FCC proposal in certificate column.
  1. Open the approved application.
  2. Go to ‘Application Summary’, click on ‘Drawing Scrutiny Report’
  1. Choose the application for which you want to see the approved drawing.
  2. Go to ‘Drawing (Concession)’, to view the approved drawing.
  1. Open online portal and go to ‘Online Payment’ tab.
  2. Fill the details and click on ‘Make Online Payment’.
  1. In architect’s console, click on ‘Registration’.
  2. Fill the details. To complete the registration process, click on save.
  1. Login in to the system. After login you will view profile by clicking on architect
  2. Click on Profile from architect dropdown.
  3. Change /update profile information in the window and click on ‘Save Changes’.
  1. Click on ‘Attach Sign’ from the profile information window.
  2. Fill the details and save.
  3. click on Attach sign.
  4. Select sign from list appear in window.
  1. Go to ‘Annexure Details’.
  2. In ‘Common Application Form ’choose the NMA option.
  3. In case of ‘Yes’ option for NMA new page will open.
  4. Fill the details and save.
  1. Click on ‘Help Desk’ from architect’s console new window will open.
  2. Click on ‘New ticket’.
  3. Fill the details and click on submit.
  4. Generated ticked will be displayed in Helpdesk Tickets tab.
  1. Click on ‘Registration’.
  2. Select type as partnership firm.
  3. Select No. of Proprietors/Partners/Directors required to add.
  1. : Open online portal and click on Citizen Search. Citizen search window can be opened either by clicking the 'citizen search' tab from BBMP AutoDCR SWCS (http://autodcr.BBMP.gov.in/bpams/BBMPForms/defaultBBMP.aspx) or the same tab from the architect's console.
  2. Click on Citizen Search
    1. File No.
    2. Name of Applicant
    3. Name of Architect/L.S.
    4. Zone Name
    5. Ward Name
    6. Plot No,CTSNo,Village,Road etc.

Bp Doc Required Answer To First Question

Bp Sub Stages Answer To First Question

Along with application Scrutiny fees is to be paid and rest all fees as per details shown in BBMP [DCR]

The applicant can pay fees by different modes such as

  1. Cash/Cheque/DD at CFC center
  2. Online payment by Net Banking/Debit Card/ Credit Card.

For construction work permit for proposed project there are many NOC required from various department, some are from Internal BBMP departments and some are from external departments like Airport, Railway, Environments, Revenue and so on.

For internal as well as some external departments, there is provision of to obtain online NOC ()approval for particular proposal from concern department.

You will get the SMS and Emails on your registered mobile number and email address respectively at different stages of granting NOC’s

After applying NOC you can also track the status of NOC against your application number through online portal.

Please see your building application will go through following process

  • Concession
  • Concession order
  • IOD
  • First CC
  • Further CC
  • BCC
  • OCC

You can raise online Tickets for any issues faced by you while applying through BBMP portal. This tickets will be looked by the support team and address the issue.

Yes you can attach the digital signature I online application.

Step 1: Open online portal and click on Citizen Search.

Citizen search window can be opened either by clicking the 'citizen search' tab from BBMP AutoDCR SWCS (http://autodcr.BBMP.gov.in/bpams/BBMPForms/defaultBBMP.aspx) or the same tab from the architect's login.

D.P. Remarks are the true extract of Sanctioned Revised Development Plan 1991providing details of land use zoning and planning proposals including restrictions viz. CRZ, Heritage, Railway buffer etc.

TDR is a certificate issued in lieu of handing over of reserved lands as per provisions of DCR, which can be utilised elsewhere, whereby financial burden of acquisition on ULB is reduced.

Plot of land reserved for public purpose, where land owner has an option of handing over the part of land and/or developed amenity to BBMP, for the intended public purpose and develop the balance land with permissible Development Right (DR) for the entire plot.

As per the newly laid procedures under EODB the practice of granting Development Permissions for reservations under Accomodation Reservation Policy, I to R , I to C permissions etc. by DP Dpeartment has been discountined and now these permissions are granted by Zonal Buiding Proposal offices on submission of online application alongwith appproval for building construction.
http://autodcr.BBMP.gov.in/BPAMSCLIENT2/Login.aspx m

For Planning purpose and to know if plot is affected by road widening, It is necessary to obtain R.L remarks.

Street Lights are provided and maintained by BBMP on Municipal Street. Providing of new street Light or for the shifting of existing Street Lights, the cost is recovered from Project proponent hence these remarks are necessary.

Parking layout remarks are for the management of vehicles from maneuvering point of view without any obstruction and as per the provisions of Development Control Regulation 1991(DCR 1991).

R.L Remarks are obtained offline. Street light remarks are generated automatically and traffic parking layout are scrutinized automatically in AutoDCR portal.

  1. Architect/Owner/Applicant can apply for R.L Remarks.
  2. Architect/License surveyor can obtain auto generated street light remarks in AutoDCR portal or Consultant can issue Street light remarks.
  3. Traffic parking layout is scrutinized automatically in AutoDCR modules or Consultant can issue parking layout remark.

The qualification criteria of consultant is mentioned in of Ease of Doing Business circular dtd. 29.12.2015 at Sr. No. 1 of Table 1, available on the website https://autodcr.BBMP.gov.in under tab Downloads and help manual for all.

Site inspection is not necessary for issue of R.L/Streetlight/Parking Layout Remarks.

Through Single Window Clearance System (SWCS), Street Light Remarks are auto generated.

  1. Street Light Remarks: Scrutiny fees are automatically calculated by system. Payment for scrutiny fee is to be made online. On payment of scrutiny fee, remarks will be generated online. Scrutiny fees are not required to be paid when consultant issues remarks.
  2. Parking layout : Scrutiny Fees are automatically calculated by system while Auto scrutiny of parking layout. Scrutiny fees are not required to be paid when consultant issue remarks.
  3. Scrutiny Fees are required to be paid offline for obtaining R.L Remarks.
  4. Circular for scrutiny fees is available on BBMP website.(Click here)
  5. .

When the plot under development is affected by Municipal /DP road/TP road then the Pro Rata charges towards installation of street light poles shall be applicable. Pro Rata charges are automatically calculated in remarks based on the information filled by architects. Pro Rata charges table per street light pole according to the width of Municipal/DP/TP road is available in auto generated remarks application module.

It is not necessary to pay pro rata charges towards installation of street light poles on internal /Access /Layout road or for right of way proposed within the plot under development.
However it is necessary to install street light poles on such roads as per auto generated street light remarks before occupation certificate or layout completion certificate.

Site inspection by BBMP staff is not necessary for installation of street light poles on internal /Access /Layout road or right of way proposed within the plot under development.
Self certification from the Consultant regarding installation of required numbers of street light poles on internal /Access /Layout road and right of way proposed within plot under development and Completion certificate from License Electrical contractor is required to be submitted to Building proposal department before obtaining occupation certificate or layout completion certificate.

Parking layout guidelines are available on the website https://autodcr.BBMP.gov.in found under the traffic and coordination tab.

Rs 920/- per CTS /CS Number (for financial year 2017-18) which will be increased by 10% in every Financial year.

  1. Three sets of block plan (scale 1: 500) & location Plan (Scale 1 in 4000)
  2. Copy of DP Remarks
  3. Copy of C.S/CTS Map

The Application is required to be submitted to AE (Survey) of Respective Building proposal Department with the following documents:

  1. Total station survey plan to the scale 1:500 by superimposing CTS Boundary
  2. Original CTS Map/MR Plan
  3. R.L Remark issued within one year

Traffic Time Line Answer To First Question

Traffic WorkFlowAnswer To First Question

Traffic Doc Required Answer To First Question

Traffic Sub Stages Answer To First Question

Traffic Required Fee Answer To First Question

For any new development / redevelopment on any plot, assessment of water requirement is essential. To satisfy this water requirement, HE’s NOC/Remarks are necessary which are issued based on availability of water supply network in vicinity.

HE’s NOC / Remarks can be obtained either through consultant or from BBMP’s AutoDCR portal.

Owner/Developer/Licensed Plumber can apply for HE’s NOC / Remarks through console of Architect/License Surveyor.

After filling Common Application Form (CAF) and paying necessary scrutiny fee the remarks can be obtained instantly.

The details regarding documents required to obtain HE’s NOC/Remarks such as circulars, consultants’ information, scrutiny fee structure etc. are available here (http://portal.BBMP.gov.in/irj/portal/anonymous/qlhedocs)

No, Site inspection is not necessary and HE’s NOC / remarks are auto generated after submission of online common application form.

Generally demand for residential building is worked out at 135 lpcd by considering 5 persons per flat. Norms for calculating demand are uploaded on BBMP portal which can be accessed here (http://portal.BBMP.gov.in/irj/go/km/docs/documents/BBMP%20Department%20List/EODB%20Circulars%20%26%20Notifications/12.%20Hydraulic%20Engineering%20Department/Water%20Supply%20Norms.pdf)

The City water supply infrastructure was designed on certain assumptions envisaging gravity of water supply from Master Balancing Reservoir (MBR) to Service Reservoirs (SR) and from SR to respective water supply zones. These reservoirs are located on hill tops visualizing developments on lower levels governed by gravity. Hence, localities / developments which are at higher elevation are required to be provided with system of Auxiliary Suction tank – pumping facility.

Hydro-pneumatic distribution is mandatory in cases where overhead water tank is not provided or where sufficient head (1.2M from top of terrace to bottom of OHT) is not available due to any reason. It’s a deliberate choice as in some cases it saves power, provides higher pressures and a terrace without tanks and maze of pipes.

Mumbai is having a maze of under-ground water supply tunnels. Any random and inadvertent boring / drilling activity could damage the water supply tunnels and hamper the water supply to large area for quite long time. Therefore, BBMP has demarcated 200mt from center line of water supply tunnel on either side as a Tunnel Safety Band. As a precautionary measure, boreholes / deep foundation by way of drilling / blasting is prohibited in Tunnel Safety Band. Existing bore-wells in Tunnel Safety Band are also not permitted to be deepened.

Trunk water mains (1200 mm diameter and above pipelines) feed to the entire city carrying water at high pressure and are also charged continuously. In the event of a burst / sudden breakdown, there is a likelihood of loss of life and property adjoining to these trunk mains. To avoid such situations and make them accessible for regular maintenance and repairs, 10mt distance is require from face of the building up to trunk mains.

If plot is abutting a D.P. road and has no water main or size of water main is less than 150 mm diameter, Pro Rata charges are applicable.

At present in general 5 types of water connections are being granted by the H.E. Department:

  1. Drinking Water connection for Labour purpose
  2. Water connection for Construction purpose
  3. Regular/ Permanent water connection
  4. Water connection granted on Humanitarian Grounds
  5. Other water connections granted for miscellaneous purposes
  1. Application: Facility for online submission of application for water connections is made through CAF along with online payment of scrutiny fee.
  2. Online scrutiny of application & approval by the competent authority: The proposal is scrutinized online and approved as per powers delegated.
  3. After approval by the competent authority, Permission Form (P-Form) is issued to the applicant online along with terms and conditions to be complied with before releasing of water connection. P form automatically generates the required payment for the applicant.
  4. On completion of the terms and conditions as mentioned in Permission Form (P-Form) and obtaining valid Road Permit, water connection will be released by the maintenance section of Asst. Engineer Water Works on site.
  5. Above process takes 15 days.

The list of documents as per the type of water connections is given here. (Water Services> Water applications. https://aquaptax.BBMP.gov.in/aqua/citizenportal/index.jsp

Once the water connection is made physically on site certificate u/s 270(A) of MMC Act 1888 is issued immediately to the applicant. The circular regarding issuance of said certificate is available here. http://portal.BBMP.gov.in/irj/portal/anonymous/qlEDBCP

Remarks from Sewerage Project are necessary for assessment of quantity of sewage generated from the proposed project and verifying if the existing network can carry the load or requires augmentation.

The applicant has to apply through Common Application Form of AutoDCR portal of BBMP for obtaining the remarks of Sewerage Project department. Separate application is not required for the same.

  1. Street connection remark.
  2. Septic tank and up flow filter remark.
  3. Overflow of STP remark.
  4. Laying of sewer line on internal road as well as on Municipal /D.P road remark and
  5. Drainage Completion Certificate.
As per prevailing circular of SP department, the scrutiny fee is calculated as under with effect from 01.04.2018 = total plot area X Rs.5.80/sq.mt (minimum fee is Rs. 3340/-) The rate per sq.mt is enhanced by about 10% during every financial year
- Prorata charges
As per the prevailing prorata rate available on BBMP portal under link http://portal.BBMP.gov.in/irj/portal/anonymous/qlcesp Also, the typical calculation of pro-rata charges is available in the console of Architect/L.P/Plumbing consultant.
- Supervision and Security Deposit -
charges for laying of sewer lines if any

The charges can be paid through online payment gate way under the Single Window Clearance System (SWCS) of BBMP.

  1. Copy of License of License Plumber/Plumbing Consultant issued by H.E department.
  2. Appointment letter of License Plumber /Plumbing Consultant issued by the IOD holder.
  3. Drainage Layout Plan showing internal drainage layout and existing municipal sewer line.
  4. Receipt of Pro-rata Charges for sewer line paid earlier if applicable.

Prorata Charges are applicable
  1. If the plots/ layout abuts to proposed D.P. road
  2. If the Property derives Right of Way from D.P road.
  1. If the sewer network is existing abutting to plot, Street connection remark is system generated in real time.
  2. If the sewer network is not available remarks for septic tank/Overflow of STP/ Laying of new sewer line on D.P road will be issued within 7 working days of receipt of on line application.
  1. For internal drainage layout of the building, completion certificate is not required to be obtained from Sewerage Project department. The same can be issued by consultant.
  2. In case of new street connection, overflow of STP and Septic tank & Overflow filter, Drainage Completion certificate is issued by Sewerage Project department on receipt of Completion certificate from L.P/Plumbing consultant as required under Drainage Bye Law section 259A, Sub-section 3, and after joint site inspection of actual work.

Minimum diameter of street connection is 150 mm S. W. pipe and minimum diameter required of sewer line is 230 mm. S.W. pipe.

For any queries one may contact Sewerage Project officials at

  1. Chief Engineer(Sewerage Project)
    mail to:che.sp@BBMP.gov.in

The Sewerage project department issues remark for Street connection, Construction of Septic tank , Overflow of STP to existing Municipal Sewer and laying of sewer line on BBMP/D.P/internal road.
The common mistakes done by applicants are as follows:-

  1. Most of the applicants are applying for internal drainage remarks/approval. However, under EODB the internal drainage remarks / approval are not issued by Sewerage Project Department. This department only issues remarks as mention above.
  2. The document related to Licensed Plumber/Plumbing consultant are not uploaded. The Sewerage remarks are issued only to Licensed Plumber/Plumbing consultant. Hence, document related to Licensed Plumber/Plumbing consultant needs to be uploaded.
  3. In case of Remarks regarding Street connection and Overflow of STP to existing Municipal sewer, it is to mention that:
    1. The said remarks are system generated. Hence, the data itself has to be entered by the applicant; if the data entered by the applicant is incorrect application will not be processed.
    2. The drainage layout plan / L-section of Street connection are mandatory, if the same is not uploaded the application will not be processed.
  4. In cases other than Street connection and Overflow of STP remark, the common mistake observed as follow:
    1. All mandatory documents regards to S.P department are not uploaded in tab of Sewerage.
    2. Uploading demand note of prorata charges as Sewerage Remarks, same is incorrect.
  5. Uploading internal drainage plan as Drainage layout plan, same is incorrect. This department only deals with sewer street connection from property to BBMP network. Hence, upload Drainage layout plan showing discharge of sewage from sewer trap inside the property to BBMP network/Manhole.

The Sewerage project department issues remark for Street connection, Construction of Septic tank , Overflow of STP to existing Municipal Sewer and laying of sewer line on BBMP/D.P/internal road.
As per EODB following documents are not required to be submitted:-

  1. In case of Street connection and Overflow of STP to existing Municipal sewer remarks:
    The remark itself is system generated. Hence, following document are not required to be uploaded:
    1. D.P remarks
    2. I.O.D copy
    3. Internal drainage plan
    4. As and when ‘One BBMP’tab on BBMP portal i.e http://portal.BBMP.gov.in/irj/portal/anonymous go live, the applicant can access details of nearby manhole and existing sewer line details on BBMP webpage. As such, there will be no need to obtain remarks from S.O department regarding detail of sewer line and nearby manhole abutting to property.
  2. In cases other than Street connection and Overflow of STP to existing Municipal sewer remarks:

All mandatory document related to Sewerage Department are necessary.

As per I.O.D/I.O.A condition prior to Commencement Certificate ‘that the requirement of bye law 4c will not be complied with before starting the drainage work and in case Municipal sewer is not laid, the drainage work will not be carried on as per the requirement of Executive Engineer (S.P) planning and completion certificate from him will not be submitted’ .

  1. Street connection
  2. Septic tank and upflow filter
  3. Overflow of STP
  4. Laying of sewer line on internal road as well as on Municipal /D.P road
  5. Drainage Completion Certificate

Scrutiny fee as per prevailing policy circular

  • Prorata charges as per prevailing policy circular when the plots/ layout abuts/affect to proposed S.R. D.P. road 1991/ SR D.P. road 2034 if any
  • Supervision and Security Deposit charges for laying of sewer lines if any
  • Penalties if any.
As per prevailing circular of SP department, the scrutiny fee is calculated as under with effect from 01.04.2018

= total plot area X Rs.5.80/sq.mt (minimum fee is Rs. 3340/-) The rate per sq.mt is enhanced by about 10% during every financial year

In Citizen Facilitation Center of any Ward Offices of BBMP or online through payment gateway.

  1. Copy of License of License Plumber/Plumbing Consultant issued by H.E department.
  2. Appointment letter of License Plumber /Plumbing Consultant issued by the IOD holder.
  3. Latest DP Remarks and Plan issued by DP department.
  4. IOD and Copy of Approved Plan issued by BP department.
  5. Drainage Layout Plan showing internal drainage layout and existing municipal sewer line.
  6. Receipt of the Scrutiny fee paid.
  7. Receipt of Pro-rata Charges paid earlier if applicable.
  1. If the plots/ layout abuts to proposed S.R.D.P. road 1991/ S.R. D.P. road 2034 whichever is stringent in accordance with provision stipulated in DCPR 2034 Transitional arrangement.
  2. If the Property derives Right of Way from D.P road.

As per the prevailing BBMP rates available on BBMP portal Click to view pro-rata calculation of pro-rata charges under link . Also, the typical calculation of pro-rata charges is available in the console of Architect/L.P/Plumbing consultant.

As per EODB, Application can be submitted to Sewerage project department through Plumbing Consultant / LP registered with Hydraulic Engineer Department of BBMP by online procedure in AutoDCR.

  1. If the sewer network is existing abutting to plot, Street connection remark is system generated.
  2. If the sewer network is not available remarks for septic tank/Overflow of STP/ Laying of sewer line on D.P road will be issued within 7 working days of receipt of application.

Application is to be made to AE(Maint) / AE(SWM) at concerned administrative ward offices by the LP/Plumbing Consultant along with following documents:

  1. Licensed copy of the LP / Consultant.
  2. Copy of property tax assessment payment receipt.
  3. Drainage layout plan showing internal drainage layout and existing municipal sewerline.

As per circular issued u/no. ChE/SP/ 2037/P&D of 16/6/2017 Rs.7800.00 per meter towards reinstatement charges and Rs. 950.00 per meter towards supervision charges shall be paid at concerned administrative ward offices. The cost of the drainage connection shall be borne by the applicant. These rates will be revised whenever the schedule of rates are revised.

The qualifications are finalized and licenses are issued by Hydraulic Engineer Department of BBMP. Hence, one may approach the said department for further needful.

Drainage Completion certificate is issued by Sewerage Project department on receipt of Completion certificate from L.P/Plumbing consultant as required under Drainage Bye Law section 259A, Sub-section 3, and there after joint site inspection of actual work.

Minimum diameter of street connection is 150 mm and minimum diameter of sewer line is 230 mm.

Sewerage remarks for Septic tank and upflow filter will be issued by Sewerage Project department.

For any queries one may contact Sewerage Project officials at

  1. Chief Engineer(Sewerage Project) che.sp@BBMP.gov.in
  2. Deputy Chief Engineer (Sewerage Project) Planning and Design dyche01sppd.sp@BBMP.gov.in
  3. Executive Engineer (Sewerage Project) Planning and Design, Western Suburb. eepdws.sp@BBMP.gov.in
  4. Executive Engineer (Sewerage Project) Planning and Design, City & Eastern Suburb. eepdcity01.sp@BBMP.gov.in

The SWD remarks are necessary as the rainwater falling in the premises needs to be properly collected and disposed off into Municipal Storm Water Drain system to avoid waterlogging.

The remarks can be obtained by the Architects /Licensed Surveyor either from BBMP Registered Consultants or BBMP auto generated remarks in AutoDCR portal.

The Architect / Licensed Surveyor can apply for auto generated SWD remarks through auto DCR system.

The qualification criteria of consultant for SWD remarks is mentioned in the circular of Ease of Doing Business dtd. 29.12.2015 at Sr. No. 4 of Table 1 (http://portal.BBMP.gov.in/irj/go/km/docs/documents/EODB/Construction%20Permit/Related%20Circulars/Manual%20of%20EODB-Building%20permission_29.12.2015.pdf) and same is also available on BBMP Portal.

The guidelines are issued under circular no. Dy.Ch.E./SWD/364/Dir/P.C. dtd. 29.12.2016 (http://portal.BBMP.gov.in/irj/portal/anonymous/qlEDBCP ) and same is also available on BBMP Portal.

Following document shall be uploaded.

  1. Planning Cell remarks for major nalla if applicable.
  2. Status of road if applicable.
  3. Proposed plan of development showing Basement / Podium if any.

The Circular of Scrutiny Fees for SWD remarks is issued u/no. Ch.E./6635/SWD dtd. 12.02.2018 Click here

The scrutiny fees are automatically calculated by the software & the payment for Scrutiny fees can be made online through payment gateway.

This can be obtained online instantly.

Remarks from office of Dy.Ch.E. (SWD) P.C. needs to be obtained for plots affected by any natural water course / major nalla / rivers.

If the plot is affected by Mithi river then remarks from office of Dy.Ch.E.(SWD) Eastern Suburbs needs to be obtained.

The Architects /Licensed Surveyor has to apply to concerned A.E.(SWM) of Ward for street connection and Completion thereof.

Following document shall be uploaded.

  1. Completion certificate from Architect / L.S. and L.P in format of appendix –II along with SWD completion plan. (Mandatory document)
  2. Structural Engineer’s stability certificate, carriage way entrance and culverts (if applicable).
  3. Dewatering system certificate provided in basement/parking pits etc.
  4. Nalla completion certificate (if applicable).
  5. Street connection completion form concerned ward (if applicable).
  6. SWD work completion certificate in setback portion (if applicable).
  7. Consultant site visit report ( Mandatory document, only if SWD remarks are taken from Municipal registered consultants)
  1. In case, the remarks are taken from municipal registered consultants then Joint site visit from BBMP staff is not necessary. In this case consultant has to upload site inspection report for generation of Auto completion certificate.
  2. In case of the remarks being obtained from auto generated application of BBMP under SWCS , the completion certificate will be issued by the BBMP after the joint site visit of BBMP staff as per EODB.

For better performance 16 Mbps internet speed is required for uploading the document and generation of auto generated SWD remarks.

  1. Necessary documents required for remarks as well as for completion certificate are not submitted.
  2. Major Nalla remarks as well as completion certificate of planning cell are not submitted
  3. Submitted documents are not readable / visible.
  1. Appointment letter for Licensed Architect / Licensed Surveyor / Licensed Plumber from Owner/ CA to Owner and copy of valid License.
  2. Ownership documents such as PR card etc.
  3. Copy of DP remarks / R.L. remarks/ AE (survey ) remarks.
  4. Copy of IOD.

SWD Time Line Answer To First Question

SWD WorkFlowAnswer To First Question

SWD Doc Required Answer To First Question

SWD Sub Stages Answer To First Question

SWD Required Fee Answer To First Question

Any generator of the C & D Waste has to transport this waste to unloading site as specified in the C & D Waste Management Rules, 2016. Therefore, it is essential to obtain 'approval to C & D Waste Management plan for such activity. Moreover, as per Hon’ble Supreme Courts Order in SLP (Civil) 23078/2017 dtd. 15.3.2018, It is mandatory for the Developer to transport and unload the C & D Waste as per directives issued by Hon. Supreme Court.

Any developer, Architect or Any other Agency who is generator of C & D waste can apply for “C & D Waste Management Plan” who are required to transport the C & D waste generated within the premises / site of work to designated unloading site where levelling and filling work is in progress.

It is an Approval given to the applicant who is generator of C & D waste for transport of C & D Waste from construction site to unloading site.

Any developer / architect or any other Agency can apply for C & D “Waste Management Plan” approval after submitting the required information on line on the BBMP website. https://autodcr.BBMP.gov.in/

The Construction and Demolition waste means the waste comprising of building materials debris and rubble resulting from construction, remodelling, repair and demolition of any civil structure.

Demolition Waste is Waste Material or debris generated from the demolition of building or any other civil structure in part or full.

  1. Permission from owner of unloading site, it's time period and quantity allowed and /or
  2. Permission for excavation for collector in case only transportation of excavated material is proposed.
  3. Bank guarantee as per Hon’ble Supreme Court orders in SLP (Civil) 23078/2017 dtd. 15.3.2018 and as per circular issued u/no. Ch.Eng./ D.P./ Gen. dtd. 06.04.2018.
  1. Name of construction site
  2. Name of Transporter
  3. Vehicle No. & Date
  4. Name of unloading site
  5. Total C & D waste transported daily
  6. Challans / Receipts from the unloading sites

Driver of the transport vehicle must carry the copy of approval of C & D waste management plan(WMP).

Apply in writing for any new unloading site registration to the Chief Engineer (Solid Waste Management)as mentioned in the Circular (Click here to view) shall approve the site on receipt of report from his /her staff.

After inspection of site and verification of documents listed in the Circular (Click here to view)and on its acceptance, by SWM Department of BBMP shall upload the designated site as approved site for unloading C & D waste.

After receipt of approval to new site as unloading site after its incorporation in the system. One can get online approval to WMP to transport the C & D waste material to newly approved designated unloading site.

If the generation of C and D waste is less or equal to 20 MT for that project, then the Applicant should avail the facility of BBMP’s “Debris on Call” System available at every ward level.

“Debris on Call” means, If the generation of C and D waste is less or equal to 20 MT for that project, then the Applicant should approach the ward office and pay the requisite charges at CFC and that C and D waste will be transported by BBMP.

SWD Time Line Answer To First Question

SWD WorkFlowAnswer To First Question

SWD Doc Required Answer To First Question

SWD Sub Stages Answer To First Question

SWD Required Fee Answer To First Question

General Best Practices Answer To First Question

General Department Answer To First Question

Guidelines for IT Answer To First Question